No phone number, ever. We never sell your info.Answers before any sign-up.Your home record is yours. Export any time, free.Every number shows its source and date.
§ 01 Quote Check

Check a quote before you sign

Put a quote next to what homeowners actually paid, then check its terms against the law that applies. We never call a quote fair or a scam: we show where it sits, what to ask, and why.

Your quote

No upload. Nothing is stored unless you save it to your home.
How was it sold?
What does the written quote say?
Is a license or registration number on the quote?
Are start and finish dates written down?
Are materials itemized (brand, model, quantity)?
Is the permit included, pulled by the contractor?
Is there a payment schedule tied to finished work?
Will they give lien releases as you pay?
Did you get a written cancellation notice?
Is the warranty in writing?
Deterministic rules, no AI guess: the same inputs always give the same answer. How it works
Result · Kitchen added or converted
Price
Enter the quoted price.
Terms
Nothing flagged by the rules on file.
AHS 2023 · hired · United States · n=31CPI-U ×1.10 to Aug 2026Rules checked 2026-10-05
Share cardSave to my homeNot a verdict on your contractor.
1 · Price

What hired owners reported paying

middle half of what owners paid
$24,74025th
$45,840median
$122,03075th
Wide scope. The 75th percentile is 4.9× the 25th, so Quote Check shows this job as context and does not place a single quote on it.

Middle half: $24,740 to $122,030; median $45,840. Survey dollars $22,500 / $41,700 / $111,000, adjusted by CPI-U (334.980 ÷ 304.702).

American Housing Survey 2023 PUFSelf-reported, nominal dollars, scope varies. A reported cost is never a quote.All geographies for this job
2 · Terms

What the rules on file say

Enter a ZIP and how the quote was sold to see the federal and state rules that apply.

What the law says, quoted with its source. Not legal advice: for your situation ask your state's contractor board or attorney general.

3 · Ask before you sign

Questions for the contractor

  1. Which permits are included?For kitchen added or converted jobs
  2. How are gas and venting routed?For kitchen added or converted jobs
  3. What is in the cabinet and appliance allowance?For kitchen added or converted jobs

Answer the questions on the left to tailor this list. Red flags for this job

4 · Local trade wage

Carpenters, United States

Wage, not price
25th pct$23.32per hour
Median$29.12per hour
75th pct$36.94per hour

This ZIP is not in a metro area BLS reports on, so this is the national figure.

Your multiplier: ×2.0Median wage × multiplier: $58/hr
You set this; casaq publishes no “typical markup” because we have no citable source for one. OEWS reports what employers pay these workers per hour. A contractor’s bill also covers the business: insurance, licensing, vehicles, tools, office staff, warranty callbacks, unbilled travel time and profit. The wage is a floor for understanding a quote, never a price.
5 · What the job involves

Kitchen added or converted

Adding a kitchen or converting space to one combines plumbing, gas or electric, venting and cabinets in a new location. It is among the costliest and least common jobs in the survey.

How it usually goes

  1. Design and permits
  2. Rough-in plumbing, electrical, gas and venting
  3. Inspections
  4. Cabinets, counters and appliances
  5. Final inspection

What moves the price

  • New utility runs
  • Structural changes
  • Cabinet and appliance choices
Original casaq explainer. General description, not an estimate for your house.Full guide to kitchen added or converted quotes

Guides by job

What each job involves, what moves its price, its red flags and the questions to ask.