Check a quote before you sign
Put a quote next to what homeowners actually paid, then check its terms against the law that applies. We never call a quote fair or a scam: we show where it sits, what to ask, and why.
- Price
- Enter the quoted price.
- Terms
- Nothing flagged by the rules on file.
What hired owners reported paying
Middle half: $990 to $2,200; median $1,540. Survey dollars $900 / $1,400 / $2,000, adjusted by CPI-U (334.980 ÷ 304.702).
What the rules on file say
Enter a ZIP and how the quote was sold to see the federal and state rules that apply.
What the law says, quoted with its source. Not legal advice: for your situation ask your state's contractor board or attorney general.
Questions for the contractor
- Is this the same capacity and fuel as my current tank?For water heater, replace jobs
- Does the price include the permit, haul-away and any expansion tank?For water heater, replace jobs
- What is the tank warranty and the labor warranty, in writing?For water heater, replace jobs
- If you are recommending tankless or a heat pump, what changes to venting or wiring are included?For water heater, replace jobs
Answer the questions on the left to tailor this list. Red flags for this job
Plumbers, United States
This ZIP is not in a metro area BLS reports on, so this is the national figure.
Water heater, replace
Swapping a tank water heater is one of the most uniform jobs in the survey: a like-for-like replacement is a few hours of work for a plumber. Prices climb when the fuel, location or venting changes, or when code updates are needed.
How it usually goes
- Shut off water and gas or power, drain and disconnect the old tank
- Set the new tank, connect water lines, gas or electric, and venting
- Add any code-required parts (expansion tank, drain pan, seismic straps where required)
- Fill, purge air, light or power up, test the relief valve and check for leaks
- Haul away the old tank; file the permit and inspection where required
What moves the price
- Tank size and fuel (gas, electric, heat pump)
- Switching from tank to tankless, or gas to electric (new venting, gas line or circuit)
- Location: attic, closet or tight basement access
- Code updates the old install never had
- After-hours or emergency service
Guides by job
What each job involves, what moves its price, its red flags and the questions to ask.